Project Description
WHAT IF we could make your parts SMALLER TO REDUCE WEIGHT AND SPACE?
CASE STUDY 1
Allegheny Performance Plastics engineered a high performance plastic large thrust washer that was previously made of metal, resulting in reduced weight, lower costs, and not a single failure in 10 years.
CASE STUDY 2
The engineers at Allegheny Performance Plastics helped this customer eliminate 45 days of lead time, reduce supply chain risk, and save $20,000 annually by spearheading a value stream mapping process on the entire product family of this aerospace fan part.
CASE STUDY 3
Allegheny Performance Plastics utilized its tribology expertise and in-house research capabilities to dramatically improve retention in this customer’s needle bearing product line and provide over $200,000 in annual cost savings.